The raised sections are all on stilts - plugs of dowel just under 2 inches high. This makes the height from top to bottom of the canals as close to 2 inches as makes no difference. In fact it's a little more as I intend to put a thin water layer at the bottom of those canals.
The rest of the time was spent filling the sides of the canals with strips of MDF and running a nicer strip of wood around the edges.
No comments:
Post a Comment